Close Menu
Clean Energy
+44 (0)1953 788458
Clean Energy Twitter
Renewable Energy Consultancy
Menu Menu

Fuel Sustainability Audits Required for Ofgem from 5th October 2015

From 5th October 2015, biomass boiler installations of 1 MW and above, must meet new OFGEM biomass fuel sustainability requirements

Failure to meet the new Regulations will result in the RHI payments being suspended or withdrawn completely.

To meet the new OFGEM fuel sustainability requirements for 1 MW >boilers, all boilers must have OFGEM approved biomass fuel sustainability audits undertaken such as an ISAE 3000 sustainability audit, and must submit completed fuel measurement and sampling (FMS) questionnaires by 5th October 2015.
Clean Energy Consultancy Ltd are able to provide advice and undertake OFGEM approved ISAE 3000 biomass sustainability audits and FMS questionnaires for clients.

For further advice contact Andrew Robertson at Clean Energy Consultancy Ltd.

Cash and Carry business seeks renewable options A recent feasibility study for a cash and carry business has identified the optimum size of solar photovoltaic system which will enable the owner to reduce operating costs and benefit from the Feed in Tariff scheme.

Read More

Thank you very much for the report which looks excellent and at this stage looks a worthwhile exercise.

Client from Oxfordshire - Biomass, solar and wind turbine feasibility